Video wall for the project "Dispatcher Control and Information System (SCADA). Substation -110/6/6 "GV-2".

The project was done in 2018, but it was done in the fall of 2020.

Video wall: 2x2 format, 55" monitors diagonal, controller to control video wall operation modes.
English

Заказчик:
Vostokenergo LLP